Contact

Service Hotline

+49 (0) 76 23 / 969-0 systems@mueller-group.com

FD-System 400 - 1000 liters

Filling

Step 1: Filling

  • Insert plunger
  • Fill product into drum
Storage

Step 2: Storage

  • Storage
  • Transportation to filling line
Preparation

Step 3: Preperation

  • Use pallet truck to move drum into drum-emptying stand
  • Lower the cover with the handwheel
Emptying

Step 4: Emptying

  • Drum emptying through the product piping to the filling line
Ready for a new load

Step 5: Ready for a new load

  • The drum is 100 % empty
  • It is easy to clean
  • The drum can then be filled again